programmable logic controller (PLC)
In scope · Default class
- Scope
- In scope if it has a direct or indirect data connection to a device or network (Article 2(1)) — almost every modern one does.
- Class
- Default — Not in Annex III or IV.
- Route
- Self-assessment is available: internal control (Module A, Annex VIII) under Article 32(1). No notified body is needed, but the full Annex I evidence and the Annex VII technical file still are.
- Dates
- Article 14 reporting has applied since 11 September 2026; the main obligations apply from 11 December 2027 (Article 71).
A networked PLC is in scope of the CRA — but no Annex III or IV category names a PLC, so it sits in the default class.